Weidenhammer Packaging was creating a new manufacturing facility in Bradford and appointed property services group Vallectric to provide maintenance and electrical services for the site.
The company has contracted Abzorb on a number of projects and chose them for the installation of the new network of Cat 7 cabling after being impressed with their work. The installation scheme included 200 Cat 7 data points, three data cabinets, fibre optic backbone cabling and Cat 7 links for the security, solar power and access control systems.
Simon Crossley, Vallectric Contracts Manager:
“As the project had such a tight programme, we needed a company that we could not only rely on to provide a quality installation and service but that we knew could deliver the project on time and within budget. I can honestly say that this project was a joint success, which was testament to the professional manner in which Abzorb’s site engineers and management staff conducted themselves.”
Back to Case Studies Armytage Road, Brighouse, HD6 1QF
01484 405 300
contactus@abzorb.co.uk
Registered in England
Abzorb Systems Ltd: Company Registration No. 4058821
Download Ofcom General Conditions